Notice of Intent to Adopt a Mitigated Negative Declaration: Well 152 Project
NOTICE IS HEREBY GIVEN that the East Valley Water District is intending to adopt a Mitigated Negative Declaration.
Project Description: EVWD proposes the drilling, construction, operation, and maintenance of a new potable groundwater supply well to replace production lost due to
decommissioning existing wells. The site would include the following features: a new wellhead; an approximately 900-square-foot split-face Concrete Masonry Unit well building with a maximum height of 18 feet; an approximately 200-square-foot chemical building containing separate rooms for chlorine and orthophosphate storage tanks; a 58,000-gallon above-ground water storage tank measuring approximately 25 feet in diameter and 18 feet tall; an approximately 400-square-foot booster station equipped with two 125-horsepower electric pumps; an approximately 350-kilowatt pad-mounted standby diesel generator; and new connections to existing storm drain system and potable water pipelines. The District anticipates that the new well would be drilled to a depth of approximately 800 feet below ground surface with a maximum 42-inchdiameter casing. The well would be equipped with an electric motor and designed to produce approximately 2,000 gallons per minute of potable groundwater.
Pursuant to CEQA Guidelines Section 15087(c)(6), no hazardous material waste
sites are located within the Project area as reviewed by this Initial Study
Mitigated Negative Declaration.
A copy of the Initial Study and all other material which constitutes the record of proceedings upon which the District based its decision to adopt this Mitigated Negative Declaration may be obtained at the District’s website (www.eastvalleywater.gov) or it can be obtained electronically at the District’s physical address at:
East Valley Water District
31111 Greenspot Road, Highland, CA 92346
Contact Person: Jason Marseilles
Phone: (909) 806-4088
Email: jmarseilles@eastvalleywater.gov
The CEQA-required public review period of the Initial Study/Mitigated Negative Declaration begins Tuesday, November 10, 2026 and ends on Wednesday, December 9, 2026 (30-days). Written comments on the Initial Study should be submitted to Mr. Jason Marseilles at the mailing address listed above no later than Wednesday, December 9, 2026 by 5:00 PM.
For more information, you may contact the East Valley Water District at the above address or by telephone at (909) 885-4900 during regular business hours.